|
Product Details:
Payment & Shipping Terms:
|
| Type: | Office Furniture | Meterial: | Metal |
|---|---|---|---|
| Handle: | Plastic, Aluminum Alloy,metal | Structure: | Knock Down Structure |
| ColorDark Grey: | Blue | Thickness: | 0.5mm,0.6mm,0.7mm |
| OEM & ODM: | Acceptable | Package:: | Standard Export Carton |
| Warranty: | 10 Years | File Divider: | Yes |
| Certification: | ISO 9001 ,ISO 14001 | Shelf: | 2 Shelves |
| Highlight: | 2 Adjustable Shelves Metal Storage Cupboard,H900mm Metal Storage Cupboard,Knock Down Structure Steel Office Cupboard |
||
Office Furniture Metal Storage Cupboard With 2 Adjustable Shelves Without Door
| Product Name | Office Furniture Metal Storage Cupboard With 2 Adjustable Shelves Without Door |
| Brand | OZ |
| Model | FYD-W005 |
| Size | H900*W900*D400mm (size can be customized) |
| Material | Regular thickness:0.7mm Cold rolled steel plate (0.5-1.2mm is available ) |
| Specfication | Four adjustable shelves, swing door, one steel handle |
| Color | Choose from RAL sample,Customized is available |
| Lock | Cam lock,Pad lock,Code lock,Barrel lock,Mass shelf lock |
| Capacity | Each layer can load 40-60kgs |
| Surface treatment | Electrostaic powder coaring epoxy resin finish,NO smell and no harm to people health and environment. |
| Use | Office,School,Home,Gym,Hotel |
![]()
![]()
The Ouzheng of mobile pedestal manufacture process as following:
1. Cutting: According to the design-drawings, the steel sheets(open and flat) are cut into different sizes by the high-accurated machines, without errors or burrs.
2. Pressing: The CNC machine tools and other machine tools work with the big-scale moulds together to reach the required standard and cooperate with the flow line production, which assure the production efficiency and quality
3. Bending: Skilled workers and advanced facilities make sure the clear lines and perfect appearance
4. Welding: Locate the work pieces into the corresponding mould, firmly weldwith CO2 shielded welding or argon-arc welding and then conduct slag removing and polishing.
5. Coating: All the sheet material parts will go through 13 treatments of water cleaning, acid-washing, phosphating etc. The imported automatic spray facilities and top-quality powder promise the coating to be flat and smooth, non-toxic and no smell.
6. Installation: To ensure the firmness of every screw, the installation workshop adopts pneumatic tools to conduct mass and flowline production.
7. Assembly and packing: Strict and special testing before packing and storage to make sure the products are highly-qualified.
![]()
FAQ
Contact Person: Ms. Joejoe
Tel: +86-15090163959
Fax: 86-0379-6222-3899